As most of you will know, I’m a big fan of Lego, and have been for most of my life. Because of this, I often find my Facebook or Twitter timelines populated with Lego-related stories, accompanied by messages like “I saw this and thought of you!”. Occasionally, I even get Lego given to me as…
Category: Building
My Year in Photos – January 29th – “Building up to bedtime”
My Year in Photos – January 29th, originally uploaded by henweb. At the end of what has been a pretty fecking tiring week, I was pleased to come home and find that Robert was feeling much better, so much so that when I walked in he was treating his mum as a trampoline. For those…
Almost finished!
Today was Tony’s last day at the house, and he managed to finish everything he planned to. All we have to do now is decorate a bit – paint the bathroom, treat the new doors etc. Henry also managed to hang a new door in the bedroom, which was a bit of a bonus!
That sink(ing) feeling…
The building is coming along fast and furious, though the Reading Festival has eaten our builder for this friday so it probably won’t get finished this week. The bath is almost completely finished now, the sink is on the wall and plumbed in, the floor has been leveled and laminated, and the radiator’s on the…
Bathroom coming along nicely..
The bathroom is coming along swimmingly, with a Friday finish looking quite probably now (finger’s crossed!)… The tiling is all but finished now, the shower tray is in and looking good, and the door is being bricked up as we speak…
The bathroom after the first 3 days…
As you can see from the photos below, the new bathroom is coming along nicely. The progress has started to be really visible, with the biggest difference (and most annoying for the builder!) being the blocking up of the old back door, which has now been done – from the inside at least. The bath…
The bathroom cometh…
Finally, after having most of the suite sat in the garage for the past 6 months, the building work started on the new bathroom today, with an absolute shed load of work getting done by our fantastic new builder Tony Allwood. The first day’s progress including ripping the entire suite out of the old bathroom,…
The builder’s last day (we think)
Well after a month of having the builders in we were very glad that Tom came back today to finish the last few little bits. He rendered the wall so its all smooth and when its dry it’ll get painted. And he tidied up the concrete on the steps as well especially over the pipe….
A new day door-ning…
After a delay of a week or so (more like two actually!) the builders finally delivered the new back door and installed it. It hasn’t got a cat flap in yet, but they’ve done half of it. Hopefully they are coming back next week to do that, plus the rendering on the outside. After that…
A doorway appears and then disappears!
Thursday was the day that they finally got round to starting the doorway. Tom came round on his own, and as well as fixing a few paving slabs to cover up the concrete footing of the wall (not sure what that means!) he managed to take the old window out, knock the wall out from…